What happened

As Sidhi Mittal reported for edie on 24 November 2026, an analysis by the supplier Good Energy found that 842 UK-headquartered organisations are likely to meet the Category A criteria in the Science Based Targets initiative's newCorporate Net-Zero Standard Version 2.0. For those that set targets under it, a claim to run on "100% renewable electricity" will come with a second number: how much of their use was actually matched with clean power in the same hour.

We checked the rule against the standard's own criteria:

  • When: Version 2.0 was released on 11 June 2026 and takes effect on 1 February 2027. The SBTi says companies setting targets in 2026 should keep using Version 1.3.1.
  • Who is Category A: any company with net turnover of at least €450 million or at least 1,000 full-time staff, and, in high-income countries such as the UK, any company with Scope 1 and 2 emissions of at least 10,000 tonnes CO2e or two of: a balance sheet of €25 million, turnover of €50 million, 250 staff.
  • What they report (criterion C32): the percentage of electricity in each part of the business using 10 GWh or more a year that was used, contracted or matched with low-carbon electricity on an hourly basis. Category A companies must have it assured, and it is shown on the SBTi Dashboard after the end-of-cycle assessment.
  • Recognition (C34): companies matching at least 50% hour by hour until 2030, 75% until 2035 and 90% from 2035 can be recognised. Taking part is optional, but every company must say whether it intends to (C33).

Hourly matching is not a condition of having a target, and annual certificates still count towards the market-based Scope 2 figure. edie notes that the GHG Protocol, whose Scope 2 rules sit under most corporate reporting, has also proposed hourly matching in its own revision, which is not final.

What the hourly figure looks like for a 10 GWh site

Here is the difference for a site using exactly 10 GWh a year, worked out with the same engine and the 2026 UK government electricity factor the app uses (0.13096 kg CO2e per kWh):

  • Location-based: 10,000,000 kWh comes to about 1,310 tonnes CO2e a year at the grid average, whatever the tariff.
  • Market-based with annual certificates: if certificates cover the full year's use, the market-based figure can be zero, and the site can say its electricity is 100% renewable on an annual basis.
  • Hourly: if, hour by hour, the tariff's generation covers only 70% of the site's use, the site would report 70%. The other 3,000,000 kWh, used on still nights and grey winter evenings, would be about 393 tonnes CO2e at the grid average. That last number is our illustration of the gap, not a figure the SBTi asks for.

What it means for your business

Big buyers will ask their suppliers harder questions. Good Energy's Tom Parsons told edie that companies are now being asked whether they can "evidence" their renewable claims. A large customer working towards hourly matching needs half-hourly meter data and the generators behind its contracts, and it will expect the same care from suppliers whose figures go into its Scope 3.

"100% renewable" is becoming a claim that needs a method. Annual matching with certificates is still allowed, but a report that only says "100% renewable" invites the question: annual or hourly, and which generators?

Most businesses are below the line. 10 GWh is the electricity of a large factory, warehouse or office campus. Most companies won't report an hourly figure, but they will still be asked for Scope 2, and the government's SECR guidance already asks for the location-based figure, with market-based shown alongside where you have it.

What to do now

  1. Report Scope 2 both ways. Show the location-based figure next to the market-based one. Our guide to green tariffs and the two Scope 2 methods explains how.
  2. Ask your supplier what is behind your tariff. Which generators, whether it can give half-hourly data, and whether any of it is matched hour by hour. Our explainer on REGO certificates covers the annual system.
  3. Check your wording. If you say your business runs on renewable electricity, say how: on site, through a power purchase agreement or with certificates.
  4. If you sell to a large company with an SBTi target, expect its supplier questionnaire to ask for your electricity figures by method. Our post on a customer asking you to set a science-based target covers the rest of the request.