Work out your Dominican Republic electricity emissions

= 26.87 tonnes CO2e in 2025 (Scope 2 (location-based))

Each kWh × 0.537 kg CO2e, the 2025 grid average for the Dominican Republic (Ember).

That is one line of your footprint. Want the whole thing done for you?

Carbon Recycling holds every UK government factor for every year, works out each line from your bills, mileage and travel, and writes your Carbon Reduction Plan and SECR report.

No card needed for the trial.

Dominican Republic electricity emission factor by year

Yearg CO2e per kWhkg CO2e per kWhChange
20255370.537-5.3%
20245680.568-2.0%
20235790.579-0.1%
20225800.580+3.8%
20215590.559-3.9%
20205810.581-0.2%
20195830.583+2.9%
20185660.566+2.9%
20175510.551-6.7%
20165900.590-2.7%
20156060.606+2.1%
20145940.594+3.9%
20135720.572-1.8%
20125820.582-1.3%
20115900.590+0.4%
20105880.588-0.9%
20095930.593-1.4%
20086020.602+2.3%
20075880.588-0.0%
20065880.588+2.3%
20055750.575-1.6%
20045840.584-4.6%
20036120.612-1.5%
20026220.622+0.3%
20016200.620+0.7%
20006160.616–

Lifecycle emissions per kWh of electricity generated in the country (g CO2e per kWh). Excludes imports and grid losses.

What the Dominican Republic's electricity is made from

In 2025, the Dominican Republic generated 22.7 TWh of electricity. 76% came from fossil fuels, which is what drives the factor up or down from year to year.

SourceShare of generation, 2025
Coal29.1%
Gas26.8%
Other Fossil20.4%
Solar9.9%
Hydro6.8%
Wind6.3%
Bioenergy0.9%

Worked example

Take an office in Dominican Republic using 50,000 kWh a year. 50,000 kWh × 0.537 kg CO2e = 26.9 tonnes CO2e, reported as Scope 2 (location-based).

How to report it

Multiply each site's electricity use in kWh, from its bills or meter readings, by the factor for the year. Report the result as location-based Scope 2. If the site buys renewable electricity backed by certificates recognised in the Dominican Republic, you can also show a market-based figure, but keep the location-based one alongside it.

UK companies with a site, warehouse or office here should use this factor for that site, not the UK grid factor. From April 2027, NHS suppliers on contracts over £5 million must report their global footprint, so overseas sites can no longer be left out. For your UK sites, use the UK government grid electricity factor.

In Carbon Recycling, set the site's country to Dominican Republic and its electricity is reported with this factor automatically, while your UK sites stay on the UK government factor.