Why restating matters
Your baseline is the yardstick for every reduction you claim. If the business changes shape and the yardstick doesn't, the comparison stops meaning anything. Buy another company and your emissions jump, though nothing got worse. Sell a division and they fall, though nothing got better. Restating puts the baseline on the same footing as today, so the trend shows real change.
When to restate, and when not to
| What happened | Ponovna določitev? |
|---|---|
| You bought a business that existed in your baseline year | Yes, add its baseline-year emissions |
| You sold or closed part of the business | Yes, take its baseline-year emissions out |
| You outsourced or brought in-house an activity, such as deliveries | Yes, if it moves emissions in or out of what you report |
| You switched to a better method or better data for a big source | Yes, recalculate the baseline the same way if you can |
| You found a significant mistake in the baseline | Yes, correct it |
| You grew, shrank, won or lost customers | Ne, to je dejanska sprememba |
| You opened a new site or bought a business that didn't exist in your baseline year | Ne, njegove emisije so nove |
| Vladni pretvorbeni faktorji so se spremenili | Ne, vsako leto ohrani svoje faktorje |
These are the triggers in the GHG Protocol's corporate standard, which the PPN 006 technical standard says your footprint should follow. Our post on why footprints fell with the 2026 factors explains the factor point in more detail.
Prag določite, preden ga potrebujete
Majhne spremembe ne zahtevajo popravka, vsakoletni popravki pa dajejo vtis, da so vaši podatki nestabilni. Vnaprej se odločite, kaj šteje za pomembno, in to zapišite v opis metode. Pogosta izbira je 5 % izhodiščnega leta, za eno spremembo ali več manjših skupaj. GHG Protocol trenutno prepušča določitev praga posameznemu podjetju, vendar njegove delovne skupine razpravljajo o enotnem pragu, zato ob naslednjem pregledu načrta preverite, ali je prišlo do sprememb.
Praktični primer
Podjetje je za leto 2023 poročalo izhodišče 42 ton. V letu 2025 kupi manjšega konkurenta, ki je v letu 2023 izpustil 6,5 ton. Njegov ogljični odtis za leto 2025, vključno z novim poslom, znaša 44 ton.
- The acquisition is 15.5% of the original baseline, above the firm's 5% threshold, so it restates.
- Ponovno določeno izhodišče za 2023: 42 + 6,5 = 48,5 ton.
- Glede na staro izhodišče je leto 2025 videti kot povečanje za 4,8 %. Glede na ponovno izračunano izhodišče je to zmanjšanje za 9,3 %.
Če evidence prevzetega podjetja za 2023 niso na voljo, jih ocenite na podlagi njegovega najzgodnejšega celotnega leta, ki ga lahko dokažete, in to navedite. Odkrito navesti oceno je bolje kot jo izpustiti.
Sprememba metode
Boljši podatki so pogost razlog za ponovni izračun. Recimo, da ste v izhodiščnem letu kupljeno blago šteli po stroških, zdaj pa imate podatke dobaviteljev za največje postavke. Če lahko novo metodo uporabite tudi za izhodiščno leto, to storite. Če ne morete, ker starih podatkov ni več, obdržite staro izhodišče in pojasnite, da del spremembe izhaja iz metode, ne iz dejanskih zmanjšanj. Naš prispevek o kupljenem blagu in storitvah pojasnjuje prehod s stroškovnih na podatke dobaviteljev.
Kako to pojasniti
- Navedite popravljeno izhodiščno leto, izvirni podatek pa pustite viden ob njem.
- V enem ali dveh stavkih navedite, kaj se je spremenilo, kdaj in kako velik je bil učinek.
- Zabeležite svoj prag pomembnosti in metodo, ki ste jo uporabili za vsako oceno.
- Prejšnje načrte obdržite na spletnem mestu. Standard PPN 006 pravi, da je to dobra praksa, saj lahko ocenjevalci spremljajo vaš napredek.
PPN 006 zahteva, da načrt vsako leto pregledate in posodobite, v šestih mesecih po koncu poslovnega leta, ob upoštevanju sprememb v strukturi organizacije, zato se ponovna določitev izhodišča naravno vključi v to posodobitev. Izbira izhodišča je opisana v objavi kako izbrati izhodiščno leto.
How Carbon Recycling helps
Carbon Recycling hrani podatke vsakega leta z vladnimi faktorji za tisto leto, Carbon Reduction Plan, ki ga pripravi, pa ima razdelek z opombami k izhodišču, kjer ponovni izračun pojasnite s svojimi besedami.