Three kinds of thing

  • Free tools answer one question each, such as "do I need a Carbon Reduction Plan?". No account, no email. See all free tools.
  • A plan is the software itself: you add a year of bills, it works out your footprint in tCO₂eTonnes of CO2e, the unit a carbon footprint is given in. One tonne is 1,000 kg of greenhouse gases, counted as if they were all CO2.More in the glossary and writes the reports. Every plan makes the 碳减排计划(CRP)一份公开文件,报告您的范围1、范围2和选定的范围3排放,并承诺实现净零。主要的英国政府和NHS合同须提供。More in the glossary, the SECR简化能源与碳报告(SECR):要求大型公司和LLP在年度报告中公布能源使用和排放的英国法律。More in the glossary report and the VSMEThe EU's Voluntary Sustainability Reporting Standard for smaller companies: a short, set format for energy, emissions and other figures that EU customers, banks and investors ask their suppliers for.More in the glossary report. See the plans.
  • Add-ons are extra jobs on top of a plan, each with its own price. Most businesses don't need any. See all add-ons.

What has happened?

Find the line that sounds like you. Start with the free tool where there is one: it tells you whether you need to do anything at all.

Someone has asked you for something

The most common reason a business starts. Check first whether you really have to, then make the document.

  • A buyer or a tender asks for a Carbon Reduction Plan

    Free tool
    我需要碳减排计划吗?Three questions about your customer and contract that tell you whether PPN 006 or the NHS rules mean you need a plan.
    套餐
    Any plan writes the Carbon Reduction Plan from a year of your bills.
    附加产品
    Public sector tender packCheck your carbon evidence against central government and NHS tender rules, including the April 2027 NHS rules, and copy answers to the carbon and social value questions, filled in from your own figures.
  • You supply the NHS

    Free tool
    NHS供应商碳检查工具五个问题,告诉您目前适用哪些NHS净零规则,以及2027年4月起有哪些变化。
    套餐
    Any plan writes the Carbon Reduction Plan the NHS asks for.
    附加产品
    Public sector tender packCheck your carbon evidence against central government and NHS tender rules, including the April 2027 NHS rules, and copy answers to the carbon and social value questions, filled in from your own figures.
  • Your accountant mentions SECR, or your company is large

    Free tool
    我需要按SECR报告吗?检查您的公司或有限责任合伙(LLP)是否必须在年度报告中披露能源和碳数据。
    套餐
    Any plan writes the SECR report for your annual accounts.
  • A customer sends a carbon questionnaire or asks for your footprint

    Free tool
    供应商问卷答案库Model answers to the 20 carbon questions customers ask suppliers most, filled in from your own figures.
    套餐
    Any plan works out your footprint, so the answers use your real figures.
    附加产品
    Customer questionnaire packAnswers to the carbon questions your customers send, from CDP supply chain to their own forms, filled in from your figures and plan, with each customer's share of your emissions worked out from what they spend.
  • An EU customer, bank or investor asks for a VSME report

    套餐
    Every plan includes the EU VSME report, filled in from the same figures.
  • Your bank's loan has carbon targets in it

    套餐
    A plan gives you the yearly figures.
    附加产品
    Lender and assurance packTrack the carbon targets in your green or sustainability-linked loan year by year from your own figures, with a statement of how the figures were put together and a full change log for your lender or assurance provider.

You want to know your footprint, or cut it

No one has asked yet, but you want the number, or a plan to bring it down.

  • You just want to know your carbon footprint

    Free tool
    kWh转CO2e计算器使用2026年政府因子将电力、燃气和燃料使用量转化为碳排放,并与2025年对比。
    套餐
    Any plan adds up a whole year, every scope, and compares it with last year.
  • You want a target and a plan to reach net zero

    套餐
    Any plan sets a target in the Carbon Reduction Plan.
    附加产品
    Net zero plannerModel the measures you're considering on your own figures, see the carbon and running-cost effect of each, check your target against the Science Based Targets initiative's rules for smaller companies, and add the plan to your Carbon Reduction Plan.
  • You run company cars or vans and are thinking of going electric

    Free tool
    电动车、汽油车与柴油车对比:每英里运行成本和CO2Compare a year's fuel or charging cost and CO2e for petrol, diesel, hybrid and electric cars of the same size, at today's prices.
    附加产品
    Fleet switch plannerEvery company car and van ranked by how much carbon it would save as an electric vehicle of the same size, from the government's conversion factors, with fuel costs per mile from HMRC's advisory fuel rates as a guide.
  • Your customers want a footprint for each product you make

    套餐
    A plan works out the energy your products share.
    附加产品
    Product carbon footprintsA carbon footprint for each of your products, per unit: materials from the government's material factors, your own energy shared across what you make, and delivery to your customer, with each step shown.

You want to save money on energy

Free checks that can find money, with or without an account.

  • You think a site may be paying Climate Change Levy it shouldn't

    Free tool
    气候变化税核查:您是否多缴了?Seven questions about a site that show the Climate Change Levy you should pay, any you shouldn't, what you could claim back, and whether the VAT on the bills looks right.
    套餐
    Every plan checks the levy on all your sites from your bills.
  • You run a manufacturing site that uses a lot of electricity

    Free tool
    British Industrial Competitiveness Scheme check: could your site be exempt?Six questions that show whether a manufacturing site looks eligible for the electricity levy exemption, how big it would be, and a rough £ guide. Applications close 30 November 2026.

A rule applies to your business

Specific rules that only some businesses have to follow.

  • You import steel, aluminium, cement, fertiliser or hydrogen

    Free tool
    我需要注册UK CBAM吗?Four questions about your imports that tell you whether you must register for the UK CBAM, from when, and your first deadlines.
    附加产品
    CBAM资料包Work out the embedded emissions and the UK CBAM charge on imports of steel, aluminium, cement, fertiliser and hydrogen. You can buy it without a plan.
  • You are a large business and ESOS applies to you

    附加产品
    ESOS Phase 4 packGet ready for ESOS Phase 4: whether you qualify, your total energy use over the reference period, the 95% you must cover, energy intensity ratios, the deadlines and a draft action plan, ready for your lead assessor.
  • You need to sort and record your workplace waste

    Free tool
    Simpler Recycling check: does your workplace meet the new rules?A few questions that show whether your workplace in England separates its waste the way Simpler Recycling requires, and when the rules apply to you. Micro-firms have until 31 March 2027.
    附加产品
    Waste logKeep the year's waste in one place: tonnes by stream, your recycling rate, and each collector with their carrier registration and any co-collection assessment, checked against the Simpler Recycling rules.
  • You let buildings and need to keep their EPCs in order

    附加产品
    Property energy standardsEach site's Energy Performance Certificate in one place, with expiry dates, and buildings you let checked against the minimum EPC E standard and the proposed EPC B for larger buildings from 2031.
  • A tender asks about flood and heat risk at your sites

    附加产品
    气候风险您每个场所的洪水和高温风险,附气候风险摘要,可用于招标或TCFD式报告。

You work on other people's carbon figures

For advisers and software companies rather than for your own footprint.

  • You are an accountant doing carbon reporting for clients

    附加产品
    会计师门户通过一次登录为客户开展碳报告,仪表板显示每位客户的进度。
  • You build software and need official emission factors in it

    附加产品
    因子API英国官方换算因子,以及120多个国家和美国每个电力区域的电力排放因子,通过简单的API接入您自己的软件。

Which plan?

Every plan makes the same reports. They differ in how much of your business they cover.

  • Starter, £59 + VAT a month: one business with up to 2 sites and 3 users.
  • Growth, £149 + VAT a month: up to 10 sites and 10 users, and you can ask your suppliers for their own figures.
  • Enterprise, from £399 + VAT a month: a group of companies, more sites, or sites outside the UK.

Not sure? Six worked examples with prices, or start the free trial: it includes everything for 14 days, so you can decide later.

开始免费试用 Try a free tool

Words you'll meet

Your footprint is split into three scopes: 范围1来自您拥有或控制的设备的直接排放:燃气锅炉、公司车辆、现场燃烧的燃料以及制冷剂泄漏。More in the glossary is fuel you burn, 范围2您购买的电力、热力和蒸汽产生的间接排放。More in the glossary is the electricity you buy, and 范围3您价值链中的所有其他间接排放,分为十五个类别,从购买的商品到商务差旅、通勤和废弃物。More in the glossary is everything else, such as travel and waste. Each bill is turned into emissions with an official 换算因子将一项活动(例如一kWh或一升)转换为kg CO2e的数值。英国政府每年6月发布一套新数据。More in the glossary 起价 DESNZ英国能源安全与净零部,负责发布英国政府换算因子。较早的版本由DEFRA和BEIS发布。More in the glossary, the government department that publishes them. Tap any underlined word to see what it means, or read the glossary.