Calculați Montserrat electricity emisii
= 50,00 tone CO2e în 2024 (Scope 2 (location-based))
Fiecare kWh × 1.000 kg CO2e, the 2024 grid average for Montserrat (Ember).
Aceasta este o singură linie din amprenta dumneavoastră de carbon. Doriți să o calculăm pe toată pentru dumneavoastră?
Carbon Recycling deține toți factorii guvernului britanic pentru fiecare an, calculează fiecare linie din facturi, kilometraj și călătorii și redactează Carbon Reduction Plan-ul și raportul SECR.
Nu este nevoie de card pentru perioada de probă.
Montserrat electricity emission factor by year
| An | g CO2e per kWh | kg CO2e per kWh | Modificați |
|---|---|---|---|
| 2024 | 1,000 | 1.000 | 0.0% |
| 2023 | 1,000 | 1.000 | 0.0% |
| 2022 | 1,000 | 1.000 | 0.0% |
| 2021 | 1,000 | 1.000 | 0.0% |
| 2020 | 1,000 | 1.000 | 0.0% |
| 2019 | 1,000 | 1.000 | 0.0% |
| 2018 | 1,000 | 1.000 | 0.0% |
| 2017 | 1,000 | 1.000 | 0.0% |
| 2016 | 1,000 | 1.000 | 0.0% |
| 2015 | 1,000 | 1.000 | 0.0% |
| 2014 | 1,000 | 1.000 | 0.0% |
| 2013 | 1,000 | 1.000 | 0.0% |
| 2012 | 1,000 | 1.000 | 0.0% |
| 2011 | 1,000 | 1.000 | 0.0% |
| 2010 | 1,000 | 1.000 | 0.0% |
| 2009 | 1,000 | 1.000 | 0.0% |
| 2008 | 1,000 | 1.000 | 0.0% |
| 2007 | 1,000 | 1.000 | 0.0% |
| 2006 | 1,000 | 1.000 | 0.0% |
| 2005 | 1,000 | 1.000 | 0.0% |
| 2004 | 1,000 | 1.000 | 0.0% |
| 2003 | 1,000 | 1.000 | 0.0% |
| 2002 | 1,000 | 1.000 | 0.0% |
| 2001 | 1,000 | 1.000 | 0.0% |
| 2000 | 1,000 | 1.000 | – |
Lifecycle emissions per kWh of electricity generated in the country (g CO2e per kWh). Excludes imports and grid losses.
What Montserrat's electricity is made from
In 2024, Montserrat generated 0 TWh of electricity. 100% came from fossil fuels, which is what drives the factor up or down from year to year.
| Sursă | Share of generation, 2024 |
|---|---|
| Other Fossil | 100.0% |
Worked example
Take an office in Montserrat using 50,000 kWh a year. 50,000 kWh × 1.000 kg CO2e = 50.0 tonnes CO2e, reported as Scope 2 (location-based).
How to report it
Multiply each site's electricity use in kWh, from its bills or meter readings, by the factor for the year. Report the result as location-based Scope 2. If the site buys renewable electricity backed by certificates recognised in Montserrat, you can also show a market-based figure, but keep the location-based one alongside it.
UK companies with a site, warehouse or office here should use this factor for that site, not the UK grid factor. From April 2027, NHS suppliers on contracts over £5 million must report their global footprint, so overseas sites can no longer be left out. For your UK sites, use the UK government grid electricity factor.
In Carbon Recycling, set the site's country to Montserrat and its electricity is reported with this factor automatically, while your UK sites stay on the UK government factor.
Related emission factors
- Antigua and Barbuda electricity: 595 g CO2e per kWh (2024)
- Bahamas electricity: 653 g CO2e per kWh (2024)
- Barbados electricity: 595 g CO2e per kWh (2024)
- UK grid electricity (UK government factor)
- Electricity emission factors for every country
- Electricity CO2e calculator for any country, to compare Montserrat with another country